CÓRAS IOMPAIR ÉIREANN
141 CLASS BO-BO DIESEL ELECTRIC B142
Builder | General Motors Electro Motive Division, La Grange, Illinois, USA, 1962 |
Withdrawn | Iarnród Éireann, 2010 |
Companies | CIÉ, Iarnród Éireann, RPSI |
Preservation Career | 2010 - Present |
Current Location | Whitehead |
Current Status | In traffic |
Locomotive B142 was bought for the Railway Preservation Society of Ireland by a generous member. The locomotive had just been taken out of regular service, and ran its first preservation trip working in multiple with sister B141 in February 2010.
The 15-strong members of the (GL8) 121 class locos of 1961 were intended to solve the motive power crisis then existing on CIÉ. They soon proved to be reliable when not overloaded, problems with poor braking were resolved with later modifications based on experience with the 141 class. The main disadvantage with the 121s was the single end cab, meaning turning at terminal stations, with consequent time and maintenance of tables. The issue of not being fitted with multiple working was resolved with the introduction of the 141s, the 121 locos were so fitted later in Inchicore.
CIÉ announced at an order signing ceremony in June 1962, that a further 37 locomotives were to be obtained from General Motors, this time to be double-cabbed and fitted with improved brakes, and a multiple working facility. The new class was to be GM's type JL8, numbered B141 to B177. The first of the new locomotives was delivered to the North Wall, Dublin on 22nd November 1962, the whole order was completed within 2 weeks.
Driver training and trials commenced 2 days later to Hazelhatch, Kildare and Monasterevan, further trials to Drogheda and Arklow took place later the next week.& Introduction to traffic was on 10th December 1962 on services to Belfast, Cork, and double-headed to Limerick. Route clearance on the UTA was carried out, the only restrictions were, no double-heading over the "Lagan Shaky Bridge" on the Belfast Central line, and members of the class were not permitted on the branch to Coalisland! They did, however, get at least as far as Omagh on the 'Derry Road'.
The use of the 141 type on passenger services cascaded the A and C classes to freight services, where the extra weight and power of the A class anyway was much appreciated. There was no real acceleration of passenger trains due to the fact that most stations were still open for business. When 'rationalisation' of smaller stations took place, this coupled with signalling improvements meant that the 141s could start to show just what they could do.
A series of speed trials on the Cork main line was planned for January 1965, aiming for a journey time of 2 hours 30 minutes for the 165 miles, but it was soon realised that to achieve this a double-headed pair would have to be "flogged" continuously, which was not acceptable. An alternative 'best' time of 2 hours 45 minutes was preferred, hopefully reducing to 2 hours 40 minutes. Further trials took place in September and October 1966, leading to a timetabled time of 2 hours 50 minutes in the June 1967 timetable, the introduction of the later 181 class in 1967/8 ensured that this schedule was achieved that bit easier.
Later the introduction of the 071 class in 1977 cascaded the 141s to all sorts of more menial jobs, they could literally appear anywhere on anything, from passenger work on the Limerick to Nenagh branch, to shale trains between Kilmastulla and Foynes. The Permanent Way Department liked them, they were a favourite on rail trains from Portlaoise, to any part of the system. Many of them got a good coating of cement at Platin or Castlemungret, and they were often to be seen as station pilots at Limerick, Heuston or Connolly.
Prior to the double-headed "Diesel Do" railtour to Longford 21st February 2010 with B141, the works in Inchicore had the two locomotives painted in the original 1962 livery and numbered B141 and B142, rather than 141 and 142 as carried from 1972.
B142 was subsequently transferred to Whitehead on 28th April 2010, where it is now in use as a shunting engine. The locomotive recently (2023-2024) received an overhaul and a smart new paint job. It was officially launched by musician and Society member Jim Corr at Whitehead on 31st August 2024.