After its original overhaul in 1989, No.85 was taken out of traffic for major boiler repairs, which at that time were the most extensive undertaken at Whitehead. After these repairs were complete the locomotive operated again on mainline railtours from 1994 until 2004. But every ten years a locomotive boiler must be lifted from its frames to allow a statutory thorough inspection and repair. This gallery shows some of the work undertaken.